How ServiceMaster Clean Replaced a Stack of Tools With One System

IndusTrack office job queues, the mobile job details screen for a cleaning job, and the GPS live map with a vehicle's details
25%less time and cost on cleaning work
1 systemfor dispatch, scheduling, GPS and field updates, instead of separate tools
"Having everything in one system is very convenient. Not having to switch back and forth between multiple tools has made us so much more efficient. It's a relief for us."Lee Peterson, Owner, ServiceMaster Clean, Bloomington, MN

Office, mobile and GPS in one system

Lee's office, his cleaning crews and their vehicles all work from one commercial system.

IndusTrack job queues for unassigned, assigned, on hold and completed jobs, with the reason each job is on holdOffice
The office dispatches jobs and sees at a glance what is unassigned, on hold and done.
IndusTrack mobile signature pad for the customer to sign on siteMobile
Crews see job details, update the job status and capture the customer's signature on site.
IndusTrack GPS tracking device installed in a service vehicle, and the GPS live map with the vehicle's driver, address, arrival time and speedGPS
IndusTrack's own GPS device goes in each vehicle (a hardware add-on). Crews and vehicles show on one live map, so the office can send the closest crew when plans change.

At a glance

  • Customer: Lee Peterson, owner, ServiceMaster Clean in Bloomington, Minnesota
  • Work: commercial cleaning for healthcare facilities, office buildings, industrial sites, hospitality, schools and religious buildings
  • Used for: dispatching and scheduling, GPS tracking of crews and vehicles, mobile job updates and signatures, custom forms and reporting
  • Result: 25% less time and cost on cleaning work, and one system instead of several

A national name, run locally

The ServiceMaster Clean brand goes back to 1929, when it began as a mothproofing company, and today runs through locally owned businesses backed by a national network. Lee Peterson owns and runs the one in Bloomington, Minnesota. His team cleans healthcare facilities, office buildings, industrial sites, hotels, schools and religious buildings, and keeping high standards across that many sites takes tight coordination between the office and the crews.

Too many tools, not enough connection

Before IndusTrack, the team juggled separate tools for dispatching, scheduling and tracking. That cost time and money, and it got in the way of on-time service.

  • No live updates. The office and the field had no shared view, so job changes meant phone calls, delays and mix-ups.
  • No central inventory. Supplies and equipment were hard to track, which led to shortages or too much stock.

Why ServiceMaster Clean chose IndusTrack

Lee heard about IndusTrack from a fellow business owner in commercial cleaning. He compared several field service products on ease of use, features and support, and chose IndusTrack because it connected the office and the field in one system.

Getting started

IndusTrack's team started by looking at how ServiceMaster Clean already worked and where time was being lost. Lee's team noticed the difference quickly and valued the hands-on help along the way.

What changed

Dispatching and scheduling in one place. Jobs are scheduled and dispatched from a single system, with far less admin work.

IndusTrack scheduling board on a tablet with cleaning jobs assigned to each crew member

Crews and vehicles on one map. Lee's team uses IndusTrack's own GPS tracking (a hardware add-on), so the office sees where crews and vehicles are in the same system as the schedule and the job details. Dispatching a change no longer starts with a round of phone calls to find out who is closest.

Live updates from the field. With the mobile app, crews see job details, update job status and capture customer signatures on site, so the office always knows where every job stands.

Custom forms and reports. The team built forms for each type of service so the right details are captured every time, and uses reports to track performance and make decisions.

The results

  • 25% less time and cost on cleaning work, freeing the team to take on more contracts without adding overhead
  • More timely and accurate service, thanks to live updates between the office and the crews
  • Happier customers, with positive feedback and repeat business
  • Lower software costs by replacing several tools with one

For Lee, the change comes down to one thing: the office and the crews now work from the same system, so nobody has to switch between tools to know where a job stands.

See what one system can do for your office

IndusTrack is field service software for commercial service contractors. Your whole office can start at no cost, and our team walks you through the switch step by step.

Start Free. No Credit Card.

Run the office side of your service business free

Customers, scheduling, estimates, invoices and equipment records at no cost for office users. Upgrade when your field team needs mobile access.

Start Free. No Credit Card.Book a Demo with the Founder